Materials

Sandy Knowe 2019 Noise Assessment

Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Appendix F

Appendix G

Appendix H

Appendix I

Appendix J

Sandy Knowe Wind Farm – Revised Noise Assessment_Oct 2019

Sandy Knowe – Additional Information Advert

Sandy Knowe Wind Farm Ltd ELECTRICITY ACT 1989

TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997

THE ELECTRICITY WORKS (ENVIRONMENTAL IMPACT ASSESSMENT) (SCOTLAND) REGULATIONS 2017

Notice is hereby given that Sandy Knowe Wind Farm Ltd, (a wholly owned subsidiary of  ERG Power Generation SpA), company registration number 06850950, Seebeck House 1 Seebeck Place, Knowlhill, Milton Keynes, Buckinghamshire, MK5 8FR has applied to the Scottish Ministers for consent to construct and operate a wind farm to the southwest of Kirkconnel and Kelloholm in Dumfries & Galloway (Central Grid Reference NS 701 106).  The installed capacity of the proposed generating station would be over 50 MW comprising 24 turbines with a ground to blade tip height of up to a maximum of 125 metres. The proposed development is subject to Environmental Impact Assessment and an EIA Report has been produced in line with current guidance.

Sandy Knowe Wind Farm Ltd has now submitted additional information to Scottish Ministers, which includes information relating to the potential noise effects of the development.

Copies of the additional information and the application (‘the information’) are available for public inspection in person, free of charge, during normal office hours at:

  • Dumfries and Galloway Council, Planning & Environment Services, Kirkbank House, English Street, Dumfries, DG1 2HS
  • Sanquhar Library, 106 High Street, Sanquhar, DG4 6DZ
  • Kirkconnel Library, Greystone Avenue, Kelloholm, Sanquhar, DG4 6RA

The information can also be viewed at the Scottish Government Library at Victoria Quay, Edinburgh, EH6 6QQ; on the application website at www.sandyknowewindfarm.com  or at www.energyconsents.scot. Copies of the additional information may be obtained from Sandy Knowe Wind Farm Ltd (tel: 01383 749645) at a charge of £20 hard copy and £15 on CD.  

Any representations to the application may be submitted via the Energy Consents Unit website at www.energyconsents.scot/Register.aspx; by email to the Scottish Government, Energy Consents Unit mailbox at representations@gov.scot; or by post to the Scottish Government, Energy Consents Unit, 4th Floor, 5 Atlantic Quay, 150 Broomielaw, Glasgow, G2 8LU, identifying the proposal and specifying the grounds for representation.

Representations should be dated, clearly stating the name (in block capitals), full return email and postal address of those making representations. Only representations sent by email to representations@gov.scot will receive acknowledgement.

All representations should be received not later than 22nd November 2019, although Ministers may consider representations received after this date.

Any subsequent additional information which is submitted by the developer will be subject to further public notice in this manner, and representations to such information will be accepted as per this notice.

As a result of a statutory objection from the relevant planning authority, or where Scottish Ministers decide to exercise their discretion to do so, Scottish Ministers can also cause a Public Local Inquiry (PLI) to be held.

Following examination of the environmental information and all views and representations received, Scottish Ministers will determine this application for consent in one of two ways:

  • Consent the proposal, with or without conditions attached; or
  • Reject the proposal

All previous representations received in relation to this development remain valid.

General Data Protection Regulations

The Scottish Government Energy Consents Unit processes consent applications and consultation representations under the Electricity Act 1989. During the process, to support transparency in decision making, the Scottish Government publishes online at www.energyconsents.scot. A privacy notice and a fair processing notice are published on the help page at www.energyconsents.scot. These explain how the Energy Consents Unit processes your personal information. If you have any concerns about how your personal data is handled, please email EconsentsAdmin@gov.scot or write to Energy Consents Unit, 4th Floor, 5 Atlantic Quay, 150 Broomielaw, Glasgow, G2 8LU.

 

 

 

 

 

Sandy Knowe 2018 EIA Application – Materials

Sandy Knowe – Application Advert

Non-Technical Summary

Sandy Knowe Pre Application Consultation Report

2018 Application – Volume 1

Volume 1 – Abbreviations

Volume 1 – Chapter 1 – Introduction

Volume 1 – Chapter 2 – Design Iteration

Volume 1 – Chapter 3 – Proposed Development

Volume 1 – Chapter 4 – Approach to EIA

Volume 1 – Chapter 5 – Policy Chapter

Volume 1 – Chapter 6 – Landscape and Visual

Volume 1 – Chapter 7 – Ecology and Nature Conservation

Volume 1 – Chapter 8 – Ornithology

Volume 1 – Chapter 9 – Geology Hydrology and Hydrogeology

Volume 1 – Chapter 10 – Cultural Heritage

Volume 1 – Chapter 11 – Noise

Volume 1 – Chapter 15 – Residential Visual Amenity

Volume 1 – Chapter 16 – Aviation, Radar and Telecommunications

Volume 1 – Chapter 17 – Forestry

Volume 1 – Chapter 18 – Schedule of Environmental Commitments

Volume 1 – Chapter 19 – Summary of Residual Effects

Volume 2

Volume 2 – Fig 2.4a – VP15 Design Iterations 2012_2013

Volume 2 – Fig 2.4a – VP15 Design Iterations 2012_2013

Volume 2 – Fig 2.4b – VP15 Design Iterations 2015_2017-18

Volume 2 – Figure 1.1 – Site Location Plan

Volume 2 – Figure 1.2 – Site Layout Plan

Volume 2 – Figure 1.3 – Aerial Site Layout

Volume 2 – Figure 2.1 – Environmental Constraints

Volume 2 – Figure 2.2a – VP01 Design Iterations 2012_2013

Volume 2 – Figure 2.2b – VP01 Design Iterations 2015_2017-18

Volume 2 – Figure 2.3a – VP12 Design Iterations 2012_2013

Volume 2 – Figure 2.3b – VP12 Design Iterations 2015_2017-18

Volume 2 – Figure 2.5 – Design Iterations 2012-2018

Volume 2 – Figure 3.1 -Environmental Designations

Volume 2 – Figure 3.2 – Cumulative Developments

Volume 2 – Figure 3.3 -Turbine Elevation

Volume 2 – Figure 3.4 – Foundation Elevation

Volume 2 – Figure 3.5 – Access Track Design

Volume 2 – Figure 3.6 – Watercrossing Design

Volume 2 – Figure 3.7 – Culvert Design

Volume 2 – Figure 3.8 – Substation Elevation

Volume 2 – Figure 5.1 – Spatial Frameworks Constraints Plan

Volume 2 – Figure 7.1 – Ecological Survey Areas

Volume 2 – Figure 7.2a – Statutory Designated Sites

Volume 2 – Figure 7.2b – Non-Statutory Designated Sites

Volume 2 – Figure 7.3 – Phase 1 Habitat Survey

Volume 2 – Figure 7.4a – NVC Habitats 1

Volume 2 – Figure 7.4b – NVC Habitats 2Volume 2 – Figure 7.5 – Otter Survey

Volume 2 – Figure 7.7a – Bat Habitat Assessment

Volume 2 – Figure 7.7b – Bat Transect Surveys

Volume 2 – Figure 7.7c – Bat Detector Locations

Volume 2 – Figure 7.8 – Bat Detector Locations (2015)

Volume 2 – Figure 8.1 – Ornithology Study Areas

Volume 2 – Figure 8.2 – Vantage Points & Viewsheds

Volume 2 – Figure 8.3 – Breeding Bird Surveys

Volume 2 – Figure 8.4a – Raptor Flightlines

Volume 2 – Figure 8.4b – Goose Flightlines

Volume 2 – Figure 8.4c – Golden Plover Flightlines

Volume 2 – Figure 8.5 – Black Grouse Leks

Volume 2 – Figure 9.1 – Watercourses

Volume 2 – Figure 9.2 – Solid Geology

Volume 2 – Figure 9.3 – Superficial Geology

Volume 2 – Figure 9.4 – Designated SitesVolume 2 – Figure 9.5 – peat probe location Jul 18

Volume 2 – Figure 9.6 – Peat Contours

Volume 2 – Figure 9.7 – Peatslide Hazard Zonation

Volume 2 – Figure 9.8 – GWDTE

Volume 2 – Figure 10.1 – Cultural Heritage Constraints

Volume 2 – Figure 10.2 – External Receptors to 10km

Volume 2 – Figure 10.3 – Cultural Heritage Cumulative

Volume 2 – Figure 10.4.1 – CHVP01 Crighton Peel and Sanquhar Castle Location

Volume 2 – Figure 10.4.2 – CHVP01 Crichton Peel and Sanquhar Castle Baseline

Volume 2 – Figure 10.4.3 – CHVP01 Crichton Peel and Sanquhar Castle Wireline

Volume 2 – Figure 10.4.4 – CHVP01 Crichton Peel and Sanquhar Castle Photomontage

Volume 2 – Figure 10.5.1 – CHVP02 Sanquhar Parish Church Location

Volume 2 – Figure 10.5.2 – CHVP02 Sanquhar Parish Church Baseline

Volume 2 – Figure 10.5.3 – CHVP02 Sanquhar Parish Church Wireline

Volume 2 – Figure 10.5.4 – CHVP02 Sanquhar Parish Church Photomontage

Volume 2 – Figure 10.6.1 – CHVP03 St Connels Church Location

Volume 2 – Figure 10.6.2 – CHVP03 St Connels Church Baseline

Volume 2 – Figure 10.6.3 – CHVP03 St Connels Church Wireline

Volume 2 – Figure 10.6.4 – CHVP03 St Connels Church Photomontage

Volume 2 – Figure 11.1 – Noise receptors

Volume 2 – Figure 11.2 – Noise Contours

Volume 2 – Figure 11.3 – Cumulative Noise Contours

Volume 2 – Figure 12.1 – Abnormal Loads Access Route

Volume 2 – Figure 12.2 – Local HGV Construction Traffic Routes

Volume 2 – Figure 12.3 – Local LGV Construction Traffic Routes

Volume 2 – Figure 12.4 -Traffic Survey Locations

Volume 2 – Figure 12.5 – Study Network Link 3

Volume 2 – Figure 13.1 – Drivetime Study Area

Volume 2 – Figure 13.2 – Business Survey Study Area

Volume 2 – Figure 13.3 – Settlements & Routes

Volume 2 – Figure 13.4 – Visitor Attractions

Volume 2 – Figure 13.5 – PathsVolume 2 – Figure 13.6 – Core Paths

Volume 2 – Figure 13.7 – Rights of Way

Volume 2 – Figure 13.8 – Recreational Activities

Volume 2 – Figure 14.1 – Shadow Flicker Map

Volume 2 – Figure 15.1 – Receptor Locations

Volume 2 – Figure 15.2 – Residential Receptors and ZTV

Volume 2 – Figure 15.3 – Receptor 1 Nether Cairn Farm and Nether Cottage

Volume 2 – Figure 15.4 – Receptor 2 Crockroy

Volume 2 – Figure 15.5 – Receptor 3 Polneul

Volume 2 – Figure 15.6 – Receptor 4 High Cairn Farm

Volume 2 – Figure 15.7 – Receptor 5 Hillend

Volume 2 – Figure 15.8 – Receptor 7 Unknown North of Croy

Volume 2 – Figure 15.9 – Receptor 8 Cairn Smithy

Volume 2 – Figure 15.10 – Receptor 9 Rigg Farm and Rigg House

volume 2 – Figure 15.11 – Receptor 10 Rigg Cottage

Volume 2 – Figure 15.12 – Receptor 11 Laigh Cairn

Volume 2 – Figure 15.13 – Receptor 12 Netherton

Volume 2 – Figure 17.1 – Existing Forestry

Volume 2 – Figure 17.3 – Forestry Management Plan

Volume 2 – Figure 17.2 – Area to be Felled

Volume 3

Volume 3 – Contents

Volume 3 – Figure 6.1 – LVIA Study area

Volume 3 – Figure 6.8 – Landscape Designations with ZTV

Volume 3 – Figure 6.10 – Landscape Character Types with ZTV

Volume 3 – Figure 6.11 – Landscape Character Units

Volume 3 – Figure 6.12 – Landscape Character Units with ZTV

Volume 3 – Figure 6.2 – ZTV to Tip A1

Volume 3 – Figure 6.13 – Transport Routes

Volume 3 – Figure 6.13b – Assessment of Effects on SUW

Volume 3 – Figure 6.2 – ZTV to Tip A3

Volume 3 – Figure 6.14.1 – VP01 A76 at Cairn Bridge Location

Volume 3 – Figure 6.14.2 – VP01 A76 at Cairn Bridge Baseline

Volume 3 – Figure 6.14.3 – VP01 A76 at Cairn Bridge Wireline

Volume 3 – Figure 6.14.4 – VP01 A76 at Cairn Bridge Photomontage

Volume 3 – Figure 6.15.1 – VP02 Libry Moor Footpath Location

Volume 3 – Figure 6.3 – ZTV to Hub 1

Volume 3 – Figure 6.15.2 – VP02 Libry Moor Footpath Baseline

Volume 3 – Figure 6.15.3 – VP02 Libry Moor Footpath Wireline

Volume 3 – Figure 6.3 – ZTV to Hub A3

Volume 3 – Figure 6.15.4 – VP02 Libry Moor Footpath Photomontage

Volume 3 – Figure 6.4 – ZTV to Tip 15km Zoom

Volume 3 – Figure 6.16.1 – VP03 The Knowe Location

Volume 3 – Figure 6.16.2 – VP03 The Knowe Baseline

Volume 3 – Figure 6.16.3 – VP03 The Knowe Wireline

Volume 3 – Figure 6.5 – ZTV to Hub 15km Zoom

Volume 3 – Figure 6.16.4 – VP03 The Knowe Photomontage

Volume 3 – Figure 6.6 – Viewpoint Locations

Volume 3 – Figure 6.17.1 – VP04 Largrae Loction

Volume 3 – Figure 6.6 – Viewpoint Locations 10km Zoom

Volume 3 – Figure 6.17.2 – VP04 Lagrae Baseline

Volume 3 – Figure 6.17.3 – VP04 Lagrae Wireline

Volume 3 – Figure 6.7 – Landscape Designations

Volume 3 – Figure 6.17.4 – VP04 Lagrae Photomontage

Volume 3 – Figure 6.9 – Landscape Character Types

Volume 3 – Figure 6.18.1 – VP05 St Connels Church Location

Volume 3 – Figure 6.18.2 – VP05 St Connels Church Baseline

Volume 3 – Figure 6.18.3 – VP05 St Connels Church Wireline

Volume 3 – Figure 6.18.4 – VP05 St Connels Church Photomontage

Volume 4

Volume 4 – Contents

Volume 4 – Figure 6.19.1 – VP06 Kelloholm Location

Volume 4 – Figure 6.19.2 – VP06 Kelloholm Baseline

Volume 4 – Figure 6.19.3 – VP06 Kelloholm Wireline

Volume 4 – Figure 6.19.4 – VP06 Kelloholm Photomontage

Volume 4 – Figure 6.20.1 – VP07 Kirkland Hill Location

Volume 4 – Figure 6.20.2 – VP07 Kirkland Hill Baseline

Volume 4 – Figure 6.20.3 – VP07 Kirkland Hill Wireline

Volume 4 – Figure 6.20.4 – VP07 Kirkland Hill Photomontage

Volume 4 – Figure 6.21.1 – VP08 Sanquhar Railway Station Location

Volume 4 – Figure 6.21.2 – VP08 Sanquhar Railway Station Baseline

Volume 4 – Figure 6.21.3 – VP08 Sanquhar Railway Station Wireline

Volume 4 – Figure 6.21.4 – VP08 Sanquhar Railway Station Photomontage

Volume 4 – Figure 6.22.1 – VP09 Sanquhar Academy Entrance Location

Volume 4 – Figure 6.22.2 – VP09 Sanquhar Academy Entrance Baseline

Volume 4 – Figure 6.22.3 – VP09 Sanquhar Academy Entrance Wireline

Volume 4 – Figure 6.22.4 – VP09 Sanquhar Academy Entrance Photomontage

Volume 4 – Figure 6.23.1 – VP10 SUW Sanquhar NE Approach Location

Volume 4 – Figure 6.23.2 – VP10 SUW Sanquhar NE Approach Baseline

Volume 4 – Figure 6.23.3 – VP10 SUW Sanquhar NE Approach Wireline

Volume 4 – Figure 6.23.4 – VP10 SUW Sanquhar NE Approach Photomontage

Volume 4 – Figure 6.24.1 – VP11 Crawick Artland Location

Volume 4 – Figure 6.24.2 – VP11 Crawick Artland Baseline

Volume 4 – Figure 6.24.3 – VP11 Crawick Artland Wireline

Volume 4 – Figure 6.24.4 – VP11 Crawick Artland Photomontage

Volume 4 – Figure 6.25.1 – VP12 SUW Near Ulzieside Location

Volume 4 – Figure 6.25.2 – VP12 SUW near Ulzieside Baseline

Volume 4 – Figure 6.25.3 – VP12 SUW near Ulzieside Wireline

Volume 4 – Figure 6.25.4 – VP12 SUW near Ulzieside Photomontage

Volume 4 – Figure 6.26.1 – VP13 Coupland Knowe Location

Volume 4 – Figure 6.26.2 – VP13 Coupland Knowe Baseline

Volume 4 – Figure 6.26.3 – VP13 Coupland Knowe Wireline

Volume 4 – Figure 6.26.4 – VP13 Coupland Knowe Photomontage

Volume 4 – Figure 6.27.1 – VP14 East Mount Lowther Location

Volume 4 – Figure 6.27.2 – VP14 East Mount Lowther Baseline

Volume 4 – Figure 6.27.3 – VP14 East Mount Lowther Wireline

Volume 4 – Figure 6.27.4 – VP14 East Mount Lowther Photomontage

Volume 4 – Figure 6.28.1 – VP15 Blackcraig Hill Location

Volume 4 – Figure 6.28.2 – VP015 Blackcraig Hill Baseline

Volume 4 – Figure 6.28.3 – VP015 Blackcraig Hill Wireline

Volume 4 – Figure 6.28.4 – VP015 Blackcraig Hill Photomontage

Volume 4 – Figure 6.29.1 – VP16 Vicinity of Mansfield

Volume 4 – Figure 6.29.2 – VP16 Vicinity of Mansfield Baseline

Volume 4 – Figure 6.29.3 – VP16 Vicinity of Mansfield Wireline

Volume 4 – Figure 6.29.4 – VP16 Vicinity of Mansfield Photomontage

Volume 4 – Figure 6.30 – Cumulative Wind Farm Initial Search Area

Volume 4 – Figure 6.31 – Cumulative Wind Farn Focused 15km

Volume 4 – Figure 6.32 – Grouped Wind Farms 15km

Volume 4 – Figure 6.33 – Baseline Wind Farms and SK Cumulative ZTV

Volume 4 – Figure 6.34 – In Planning Wind Farms ZTV

Volume 4 – Figure 6.35 – LCAs with WFs in planning

Volume 4 – Figure 6.36 – Landscape Designations with windfarms in planning

Volume 4 – Figure 6.37 – Principal Route and Settlements with windfarms in planning

Volume 4 – Figure 6.38 – Cumulative ZTV and Group 1

Volume 4 – Figure 6.39 – Cumulative ZTV and Group 2

Volume 4 – Figure 6.40 – Cumulative ZTV and Group 3

Volume 4 – Figure 6.41 – Cumulative ZTV and Group 4

Volume 4 – Figure 6.42 – Cumulative ZTV and Group 5

Volume 4 – Figure 6.43 – Cumulative ZTV and Group 6

Volume 4 – Figure 6.44 – Cumulative ZTV and Group 7

Volume 4 – Figure 6.45 – Cumulative ZTV and Group 8

Volume 4 – Figure 6.46 – Cumulative ZTV and Group 9

Volume 5

Volume 5 – Contents

Volume 5 – Appendix 1.1 – Consented Dev Decision Notice

Volume 5 – Appendix 1.2 -DGC NMV Agreement

Volume 5 – Appendix 3.1 – Drainage Strategy

Volume 5 – Appendix 4.1 – Screening Request

Volume 5 – Appendix 4.2 – Screening Opinion

Volume 5 – Appendix 4.3 – Scoping Report

Volume 5 – Appendix 4.4 – Scoping Opinion

Volume 5 – Appendix 4.5 -Consented Development Section 75 Agreement

Volume 5 – Appendix 6.1 – LVIA Methodology

Volume 5 – Appendix 7.1 – Nature Conservation Legislation

Volume 5 – Appendix 7.2 – Ecology Survey Methodology

Volume 5 – Appendix 7.3 – P1HS Target Notes

Volume 5 – Appendix 7.4 – NVC Target Notes

Volume 5 – Appendix 7.6 Bat Survey 040912_V1

Volume 5 – Appendix 7.7 – Electrofishing Survey Results

Volume 5 – Appendix 8.1 -Ornithology Technical Appendix

Volume 5 – Appendix 8.2 – Collision Risk Modelling

Volume 5 – Appendix 9.1 – PSRA_part a

Volume 5 – Appendix 9.1 – PSRA_part b

Volume 5 – Appendix 9.2 – Supplementary PSRA

Volume 5 – Appendix 9.3 – Water Crossing Schedule

Volume 5 – Appendix 10.1 – Gazetteer within the site

Volume 5 – Appendix 10.2 & 10.3 – Gazetteer outwith the site

Volume 5 – Appendix 11.1 – Guidance

Volume 5 – Appendix 11.2 – Cumulative Development

Volume 5 – Appendix 11.3 – Noise Monitoring Locations

Volume 5 – Appendix 11.4 – Wind Speed and Direction During Baseline Noise Survey

Volume 5 – Appendix 11.5 – Calibration Certificates

Volume 5 – Appendix 11.6 – Background Noise Levels

Volume 5 – Appendix 11.7 – Operational Noise Level Limits

Volume 5 – Appendix 13.1_Socio-economic tables

Volume 5 – Appendix 13.2_Tourism Tables

Volume 5 – Appendix 13.3_Business Survey Questionnaire

Volume 5 – Appendix 13.4_Tourism & Recreation Impact

Volume 5 – Appendix 13.5 – Agreement of Intent

Volume 5 – Appendix 13.6 – social impact evaluation

Volume 5 – Appendix 14.1 – meteorological data

Volume 5 – Appendix 14.2 – potential shadow periods

Volume 5 – Appendix 14.3 – Nether Cairn Receptor – Photographs

Volume 5 – Appendix 16.1 – Aviation Consultation

Volume 5 – Appendix 16.2 – Aviation Impact Assessment

March 2016 Brochure

2015 Brochures

Location Map

Screen Shot 2018-08-15 at 11.18.54

Site Layout

Screen Shot 2018-08-15 at 11.19.50.png

Site View